Septic-to-sewer conversions, stormwater basins, baffle boxes, muck dredging operations completed across Brevard.
$583.4 million allocated across the tax's 10-year life. Approved unanimously by the Citizen Oversight Committee, adopted by the Board of County Commissioners in February 2026. Every project shows up on the county's live public dashboard.
Source: Brevard County Legistar File #8632 — 2026 SOIRL Plan Update. Live dashboard: brevardfl.gov/SaveOurIndianRiverLagoon. Note: Category totals shown above sum to $557.6M of direct project spending. The remainder of the $583.4M ten-year projection covers administrative overhead, contingency reserves, and the county's compliance monitoring costs — all detailed in the linked Legistar file.
These numbers come from the SOIRL Citizen Oversight Committee's public progress reports. Every project is verifiable on the county's live dashboard.
Septic-to-sewer conversions, stormwater basins, baffle boxes, muck dredging operations completed across Brevard.
Quick-connect sewer conversions and advanced septic upgrades — cutting nitrogen at the source, one house at a time.
SOIRL-funded projects have attracted state and federal grant dollars on top of the local tax revenue. Per the county's SOIRL Project Plan dashboard as of May 14, 2026: $115.3 million in additional grant funds layered on top of $522.1 million in local tax collections.
The cumulative modeled nitrogen load reduction from SOIRL-funded projects since 2016 is on the order of a million pounds. These are engineering-modeled estimates from project reports (septic conversions, wastewater upgrades, muck removal), not direct in-water measurements of nitrogen flux.